Saturday, July 31, 2010

7/30/10 Coming along! Bimini, Teak, Captains chair shots.

Bimini just about done. Some corrections need to be made though :(
Looks like the backrest was sewn on backwards. :( Back to the sewing machine.

Wood work almost all teaked and will be re-installed next day.
New radio and antenna with starboard Nav light installed last week.

Monday, July 26, 2010

Mounting electronics 7/26/10


Mounted VHF inside v-berth.

New water proof switch panel wired behind dash. Just needs to be mounted.

Also, installed new running lights!

Decking repaired and resealed!!! 7/26/10


Decking needs a wash down, but sealed up and nice and sturdy.....because no one is getting any thinner!


Transom door idea.

Hatch door is going to be mounted on a teak frame outlining cut out.

Saturday, July 24, 2010

Sunday, July 18, 2010

Pre-Bottom Paint 7/17/10


Getting the bottom paint done. Interior, cushions, electronics and bimini are on the way.

Sea Trial 7/15/10


Sea trial LA Harbor.











http://maps.google.com/maps/ms?ie=UTF8&hl=en&msa=0&msid=105807185277174409243.00048b725aaa13ec3f817&t=h&z=15

The Purchase




1977 Wellcraft V20 Fisherman purchased in Bakersfield on 7/10/10 for $2450.